| Artikelnummer | 213082492 | Erscheinungsdatum | 2026/04/12 | Listenpreis | €15.16 | Modellnummer | 213082492 | ||
|---|---|---|---|---|---|---|---|---|---|
| Kategorie | |||||||||
The Magnesium Stenograph long cone sharpener from KUM forms extra long tips and is ideal for precise work, especially in the field of art. With its curved blade, it prevents the lead from breaking and ensures a clean and even tip. The side ridges of the body provide extra grip and ensure comfortable handling. Made of magnesium, the pencil sharpener allows for maximum precision and stability, which is essential for achieving an ideal sharpener result. Made in Germany, this sharpener impresses with its longevity and high-quality workmanship.
| Color | Silver |
|---|---|
| Brand Name | KUM |
| Unit Count | 1.0 Count |
| Item Weight | 28.2 Grams |
| Manufacturer | KUM |
| Model Number | AZ104.06.16-M |
| Power Source | Manual |
| Material Type | Magnesium |
| Target Audience | Artist |
| Manufacturer Part Number | AZ104.06.16-M |
| Item Dimensions D x W x H | 3.78"D x 0.67"W x 0.63"H |
| Specific Uses For Product | Art and Drawing Activities |
| Global Trade Identification Number | 04064900066906 |
Wenn Sie Unvollständigkeiten oder Fehler in den Produktinformationen auf dieser Seite bemerken, nutzen Sie bitte das Korrekturformular unten.
Korrekturanfrage